
Cargo & RORO
Up the ramp, lashed down, across by morning.
Motorcycles to ten-wheelers roll straight on at the stern ramp and straight off in Leyte, Biliran and Samar — on the same sailings our passengers take.
Illustrative image of night loading over the stern ramp. Roble vessels are RORO: nothing is craned, and nothing is crated to get aboard.
Freight lanes
Where freight moves, and how often
Departures counted from the published timetable, both directions. Vehicles travel on the passenger sailings; general cargo travels on those and on the dedicated freight schedules.
Cebu – Hilongos
Hilongos, Leyte
about 5 h at sea
20 a week
Nightly freight capacity alongside the passenger sailing, plus daytime departures Friday to Sunday.
Cebu – Ormoc
Ormoc, Leyte
about 5 h at sea
14 a week
A departure in each direction every day — the fastest turnaround for time-sensitive loads.
Cebu – Naval – Catbalogan
Naval, Biliran & Catbalogan, Samar
about 9–12 h at sea
4 a weekPassenger sailings on hold — freight by arrangement
Freight continues to move to Biliran and Samar on our cargo schedules while the passenger sailings are on hold.
General cargo we handle
Agricultural produce
Copra, corn, root crops, vegetables and fruit moving both ways across the strait.
Packaged food & beverage
Palletised dry goods, cases and drums for distributors in Leyte and Samar.
Appliances & general merchandise
Retail stock for provincial branches, crated and shrink-wrapped.
Construction materials
Cement, steel, hardware and roofing for projects across the Eastern Visayas.
RORO vehicles
Pick what you are shipping
Five categories load over the same stern ramp, under the ramp crew’s direction. Pick one to see how it is handled and what to have ready.
Onto the deck
Motorcycles & tricycles
Motorcycles, scooters, tricycles with sidecar
- On the ramp
- Fuel tank no more than half full, and the battery stays connected for lashing.
- Cut-off
- 3 h before departure — indicative
- Bring
- OR / CR · Driver's ID · Gate pass
From request to receipt
Four steps, start to finish
- 01
Ask for a quote
Tell us the lane, the load and the date you want. Three short steps online, or one call to the freight desk.
- 02
We confirm the slot
The freight desk comes back with the rate and books space on the sailing you asked for.
- 03
Bring it to the pier
Arrive before the cut-off with the documents below. We weigh, document and lash it.
- 04
Your consignee receives it
The vehicle drives off at the other end, or your consignee signs for the cargo at the freight desk.
At the pier
What to bring
Vehicles should be at the pier at least 3 hours before departure so we can weigh, document and lash them properly.
- OR / CR
- The vehicle's official receipt and certificate of registration, original or certified copy.
- Driver's ID
- A valid driver's licence, and a company ID if the vehicle is commercial.
- Gate pass
- Issued at the freight desk once the booking is paid. Present it at the pier gate.
Cut-offs and documents shown here are indicative for this demonstration. The freight desk confirms both when it quotes.
Freight desk